I'm a chem eng doing some work on a boiler optimisation project. However, my background is wastewater and evaporators, not steam plant so I'm on a steep learning curve.
Our plant operates a 14 ton per hr solid-fuel, fixed-grate boiler. Depending on factory demand, the boiler load can drop to...