tpmartin185,
If you already had the intention for a bypass, why not consider a pressure regulating valve or an adjustable choke valve for the by-pass line, if your centrifugal pump cannot be replaced.
This will allow you a great extend of flexibility to regulate the line pressure in relation to...
Seeking advise on 27T spreader beam construction.
25 feet span between padeye 1 and 2 each bearing a 10T vertically suspended load.
Single point crane lift using 2-legged wire-rope sling with 45 degree leg angle attached to top of padeye 1 and 2.
Will W8 x 67# beam or 8" Schedule 80 round...