Thanks.
Yes, we are doing shoring and bracing. We did not do slab longer 100' before and I am interesting in specific moments to do that slab monolitic.
Yevgen
Thanks a lot.
And what about monolitic flat slab 200'x(20'-40')x8" (not SUPERflat), which is opened from each side and is standing on columns. Gaps between columns near 20'. Where better start puring: from the center to the edges, from one edge to another, or from opposit edges to center...
It will be "superflat floor" in the eight-store appartment building. But ground floor will be have two drop-steps, one feet each. Concrete 6000 psi. I gouing to use two concrete pumps.
In the one day I am going to pure column and other day slab.
How better doing there?
Thanks. Yevgen