  1. ydolotov

    Long slab

    Thanks. Yes, we are doing shoring and bracing. We did not do slab longer 100' before and I am interesting in specific moments to do that slab monolitic. Yevgen
  2. ydolotov

    Long slab

    Thanks a lot. And what about monolitic flat slab 200'x(20'-40')x8" (not SUPERflat), which is opened from each side and is standing on columns. Gaps between columns near 20'. Where better start puring: from the center to the edges, from one edge to another, or from opposit edges to center...
  3. ydolotov

    Long slab

    It will be "superflat floor" in the eight-store appartment building. But ground floor will be have two drop-steps, one feet each. Concrete 6000 psi. I gouing to use two concrete pumps. In the one day I am going to pure column and other day slab. How better doing there? Thanks. Yevgen
  4. ydolotov

    Long slab

    Hi, I have to pure slab 30'x200' 8". How do it in one pass without expenthion join? Thenks, Yevgen