    Electric Substation Termography - Frequency

    G'day All, Is there any method (or industrial standards) of establishing how often electrical substations (MCC and HV Switches) should be surveyed for faults using Thermography? We traditionally used to check them every 12 months. Should we move to 6-monthly intervals or stay at 12? Regards, AP