Gentlemen,
Your great advice is on track with what I had already considered. These plans are in the final design phase, meaning they are ready for the final once over, verification, quantities, and specifications. According to our contracts, we charge 80% at the time of bidding and then the...
I am mainly concerned with the electronic files. I don't want to hand them over to this other firm. I don't mind giving them the paper plans, once we have been paid of course.
We are a small Consulting Engineering Firm. A City we were doing a lot of work for has hired another "extremely" large firm to do their work. We were asked to design approximately 4 projects prior to the change of consulting firms. We have now been asked to stop design and turn over our work...
I'm doing a LOMR for the City here in Oklahoma. I have duplicated effective study running through HEC-RAS. I cannot get the BFE's to the .5' acceptable range. The E431 is hard to read. Do I have to make the duplicate effective model work or can I document why it doesn't .
Thanks,
OUGOOCH