pre-construction cross sections were not completed so the survey is a bust. The method of measurmentt for payment was to be pre- vs post construction cross sections. Monthly payments were baised on truckload counts. Is it reasonable to utilized truckload counts as a method of measurment for...
one engineer started to cross section a lake to be dredged, but never completed the work. another engineer cross sectioned the lake post construction-excavation. The only measurment of the amounts removed are the truck load counts. Any ideas on how to determine the volume of material removed...