Basically we have made ground over the alluvial sands and clay beneath the alluvial sands. Our main concern is the high water table which may cause a serious problem....if we would go for steel or concrete piles wouldn't the high water table be an issue? At the moment we are considering vibro...
Site description:
The site consist of a roughly rectangular area of land approximately 90 m by 70 m. There are grasses areas to the north and west. To the south is a grassed area approximately 100 m wide, beyond which is the access road to the site. The site is generally leveal apart from a...
Hi There! We are building a pharmaceutical plant near the seaside in Europe....the site is made ground over estuarine and marine alluvial, over weak rocks, clays and sands of the mercia mudstone group with alluvial sands and mercia mudstone group. Base on the SI report we suggested to our client...