  1. sykimm

    optimization of trestle piles

    I'm now designing marine pipeway trestles, supported by piles. Is there anybody to give me some idea to reduce number of piles and/or structures? Normal design shows 4 nos. of batter piles per one bent. Thanks in advance.
  2. sykimm

    Bored Piles in UAE

    Hi! All; Is there any guy to let me know why arabian peninsular conturies use bored pile instead of the steel pipe pile or the precast prestressed spun piles? Is there any corrosion issues on this common practice or any other deliverable issues for the pc piles? Any responses would be...
  3. sykimm

    Design Methodology for Precast Concrete Piperack

    Is there any body to help me to design precast concrete piperack? - connection details for column and spread footing - connection details for column and longitudinal beam and also trans beam Any comments and/or information would be helpful
  4. sykimm

    gravel screeding for immersed tube tunnel

    (The same question was posted in Civil Engineering other topics) Hi, I'm looking for some information to get the appropriate gravel foundation for immersed tube tunnel. Factually, immersed tube will be designed for seawater intake and we are now considering direct gravel foundation under...
  5. sykimm

    Gravel screeding for Immersed tube tunnel

    Hi, I'm looking for some information to get the appropriate gravel foundation for immersed tube tunnel. Factually, immersed tube will be designed for seawater intake and we are now considering direct gravel foundation under the sea of depth 20m. If you have any information and experience...
  6. sykimm

    Turbine Foundation - Bored Pile?

    Is there any reason to choose the bored pile against lateral loading, such as seismic load?
  7. sykimm

    Turbine Foundation - Bored Pile?

    Thanks for your reply. On your reply, only economic reason would be considered. How about the pile size-bearing capacity-lateral capacity on each case. Waiting your reply.......
  8. sykimm

    Turbine Foundation - Bored Pile?

    Hi, I've seen that almost turbine foundation has been supported using bored pile, not concrete spun pile. If you know the reason why, please let me know. What are the restrictions to use concrete spun driven pile for heavey vibratory equipment foundations.
  9. sykimm

    under sea rock excavation

    Dear all, I'd like to find the economical method to excavate the rock under sea condition. Due to the vibration restriction, explosives cannot be used. 1.0 kine is the criteria for the vibration. If you have any idea, let me know.
  10. sykimm

    Cable Analysis using Staad Pro

    Is there any body to help me to conduct the structural analysis for single cable with fixed end support using STAAD Pro? My questions are 1. in 'geometry', how to input the geometry of cable? in 'member specification cable', how to get the initial tension force? Before running the...
  11. sykimm

    cable analysis in STAAD Pro

    Is there any body to help me to conduct the structural analysis for single cable with fixed end support using STAAD Pro? My questions are 1. in 'geometry', how to input the geometry of cable? in 'member specification cable', how to get the initial tension force? Before running the...
  12. sykimm

    Pipe Bedding on Very Soft Clay in Coastal Region

    Thank you, "fndn". As you noted, c value in previous post was incorrect. factually c=0.05 kg/cm2. SPT N-value is 1 to 2 of very soft clay. If you have any experience, please let me know.
  13. sykimm

    Pipe Bedding on Very Soft Clay in Coastal Region

    Dear all, I'd like to design of pipe bedding on very soft clay stratum in coastal region. There is very soft clay ( c = 0.5 kg/cm2, SPT N=0~2) of 10 m thick depth. Water depth will be less than 5m. Any experience like this matter would be helpful to me.
  14. sykimm

    SNI-1726-2002 Indonesian Seismic Design Code

    Dear Mr. Bob, Could you please let me know what ASCE code you mean. Regarding the tsunami, your experience would be helpful to me. For your further response....
  15. sykimm

    SNI-1726-2002 Indonesian Seismic Design Code

    Does anyone know where I can get SNI-1726-2002 Seismic Design Code of Indonesian National Standard. Thanks
  16. sykimm

    Indonesia - Seismic Design Code

    Dear all, Is there any one to help me on this matter. Recently I have to design concrete foundation in Indonesia under seismic conditions. However there is no information for local seismic spectrum of Jakarta (UBC Zone 4, as per UBC, Indonesia Seismic Zone 4) on the web. Peak acceleration of...
  17. sykimm

    API 650 Seismic Zone for Indonesia

    Indonesia local code zone 4 is different from UBC Zone 3. So far, I have no information on this matter.
  18. sykimm

    API Wind Load : one minute ?

    Thank you Mr. Braune. Your answer would be quite helpful to me. Then, which API code number specify the maximum wind speed less than one minutes? Please let me know. Thank you again.
  19. sykimm

    API Wind Load : one minute ?

    Hello All, In API 650 Section 3.11, wind load is specified based on 160 km/hr. But not mentioned 3 sec gust or 10 minutes average wind speed. Factually, I would like to conversion my wind speed "x" (API maximum speed less than one minutes) to API general calculation speed, e.g., (x/160) to get...
  20. sykimm

    Pretensioned spun concrete pile - wire cut-off

    Thank you, Zambo! Compared with your comments, such as "common detail", in Japn details, pretensioned wires shall not be cut-off for Pretensioned Spun Concrete Piles. If you have any web-site on said details, please let me know. For further help....