Hi,
I want to learn how design following:
1. Replace existing MWH/MVARH meters at 12Kv of two 69/12Kv transformer with MW/MVAR meters.
2. REplace existing real time ammeters with demand ammeters for six 12Kv feeders in the substation cotrol house for feeder load management
Your help is...