    excavating under existing comm.building

    moxl, answer is "a bit" late but you can check the site www.yurkevich.ru a firm deals with top-down construction.
  2. lorik

    carpark ramp slope

    thanks evr, this carpark will be in moscow and unheated. however ramps will be electrically heated so sliding factor is not considered. btw i ve just learned that in many countries` legislations, slope is limited to %15. it is surprising that you design steeper than this figure though the...
  3. lorik

    carpark ramp slope

    hi to everybody. i would like to ask, what should be the slope of a ramp inside a carpark for cars not to hit ground during climbing or going down. carpark is limited with cars 1.75 m. in width and 5 m. in length. thanks.