  1. CanEnergy

    Ground fault coordination with downstream fuse

    Does transformer connection matter? Primary Delta or Wye? If a fault within a delta transformer happens , it will evolve to phase fault quickly so coordinating with ground element results in small fuse rating that causes miscoordination with LV breaker settings curves
  2. CanEnergy

    Ground fault coordination with downstream fuse

    "Yes"in a sense that fuse should coordinate with Ground OR phase element? Which one or both.
  3. CanEnergy

    Ground fault coordination with downstream fuse

    When coordinating a feeder fuse in a switchgear line up with upstream main or substation breaker, would you coordinate the fuse with phase or ground element of the breaker?Thanks
  4. CanEnergy

    Arc Resistant Switchgear

    I work in maintenance department of a manufacturing company. We intend to change the hv fuses inside an arc resistant switchgear and install a fix-mounted breaker. Can we validate that the switchgear stays as arc resistant considering the construction of the switchgear will not change? Thanks