I am currently designing a cathodic protection system for an offshore platform and accounting a problem in providing CD to the skirt pile. The skirt pile cannot be electrically connected to the jacket due practical reasons. Is there any methods I can consider?
I am designing a 4-storey steel frame structure, just wondering whether is better to use diagraphm or shear wall to design against lateral wind loading.