Typically, in what time frame do most employees arrive just prior to the start of the workday and conversely, in what time frame do most employees leave immediately after the end of the normal workday?
Is there statistical data on this subject for purposes of determining peak trip ends for...
Typically, in what time frame do most employees arrive just prior to the start of the workday and conversely, in what time frame do most employees leave immediately after the end of the normal workday?
Is there statistical data on this subject for purposes of determining peak trip ends for...
Ectroy -
If I understand your approach to the problem, basically you used the interior drop assembly as a means of piping the sewerage flows directly from the force main connection to the manhole over to the outlet pipe leaving the structure. At the connection of the drop assembly to the inlet...
I apologize to those who may have seen and responded to this same thread on the "Civil/Environmental Engineering Other Topics Forum", but I'm new to the site and didn't realize that there was a forum dedicated to stormwater engineering. So, once again I post my thread in hopes of obtaining some...
Iha,
Besides the NYSDEC requiring that a treatment unit be placed near the discharge end of the drainage system, they are also requiring "hoods" be placed over the outlet pipes located within each and every inlet/catch basin in the entire stormwater system.
As part of a stormwater improvement project, which serves a local urban area, the New York State Department of Conservation is requiring that a pretreatment facility be installed near the drainage system's downstream end, just prior to its discharge into tidal waters. They are looking for some...