  1. Ven80

    Time study technique in a fast changing process

    I am an Industrial Engineer assigned to perform time study. The problem I face is that the process as such takes overall time of less than 80 seconds, and there are 6 to 7 steps in the process. How do I go about this? I need to find the pieces per hour to run the production schedule. Thanks
  2. Ven80

    Establishing standards

    I am working in an industry, where many people work on the same task, like assembling small pieces of jewels. How will I establish standards for this process? Thanks