Thanks for you reply!
Yeah, the $$$ is a big down side of going with cooper. Customer is willing to reach deeper in his pocket for that.
The cooper option is being looked at by the building owner as a more "trouble free" way to go when thinking in the long range, like 15-20 yrs. No one...
I'm about to start construction of a new building with 70 ton of chilled water capacity.
Can anyone give me ideas about the pros and cons of using cooper piping rather then steel for the chilled water lines?
I have specd ASTM A-120 seamless galvanized steel sch 40 for up to 2 1/2" and ASTM A-53...