Lets say the total volume of condensate coming back at shutdown is "X" gallons. The receiver is vented to atmosphere. Max inflow is "Y" gpm. The receiver can overflow.
Does the tank need to be sized for the volume of condensate in the campus loop at shutdown? The deaerator is sized for a 10...
What is the proper way to size a condensate receiver at boiler plant (over 200,000 pph)? Condensate from the condensate receiver is pumped to the deaerator tank.