  1. rme1997

    What is the probable cause of steam moisture

    Hi, We have experiencing steam moisture in the dehumidifier unit where we used steam to dry the desiccant wheel. The boiler we use to supply the operation is 100BHP. After we replace the reheat coil and defective steam trap, the problem is still re curring. May I know what is the cause of...
  2. rme1997

    Boiler heating Surface

    What is the advantage having a design of 5ft2/BHP versus the 3.5 ft2 BHP heating surface for 100BoilerHP?
  3. rme1997

    Tips on the 100 bhp boiler installation.

    Thank you all for the informative and worth feedback. I greatly appreciated those information. FOr the summary: 1. - Do you have layout drawings developed for the boiler room/area ? - Yes, we had an existing boiler room and the 100BHP will replace the 30 yrs old boiler. 2- Have you purchased...
  4. rme1997

    Tips on the 100 bhp boiler installation.

    We are now looking forward for the purchasing of 100bhp fire tube boiler. May I know what are the things should I considered in installation on operational side, safety features and design? What are the procedure for the commissioning and things to be recorded and watch before and after putting...
  5. rme1997

    Boiler Steam Capacity

    We are planning to purchase a new boiler to be used as a base load. We conducted the steam plant measurement to determine the existing capacity of the factory and we got 4028 kg/hr.How could we convert the load into Boiler Horse Power?
  6. rme1997

    Boiler tube repair or replace?

    I had a on going evaluation of our 60 HP boiler (Fire Tube), there was an water leak evident in the tube end of the second pass of the boiler. I already expanded the entire tubes 3 months ago.It is advisable to weld the tube end were the leaks coming out or replaced the entire tube with the new...
  7. rme1997

    Boler rehabilitation

    I am currently proposing the rehabilitation of our old Yorkshipley boiler (1965) with rated 60 HP and rated steam of 100 psi but unfortunately 70% is only utilize.Before that, I initiate Non Destructive Testing for data gathering if this unit is still conform for the safety operation.Result of...
  8. rme1997

    Boiler rehabilitation

    I am currently proposing the rehabilitation of our old Yorkshipley boiler (1965) with rated 60 HP and rated steam of 100 psi but unfortunately 70% is only utilize.Before that, I initiate Non Destructive Testing for data gathering if this unit is still conform for the safety operation.Result of...