Hi,
I`m in charge of a dock construction which is just beside sea. It`s length is 100m, parallel to sea, and depth is 8m. I designed the walls as 800mm bored piles, constructed capping beam on them and installed ground anchors from the capping beam towards sea with 40degs, total 21m anchor...
Hi everyone,
Recently I`m involved in a dry dock design which is approx. 120m in length x 50m in width x 9m in heigth at a fat clay soil where GWL is +1.00m. Top of ground is +1.6m. There is a weathered rock layer at around -8 to -15.
I`m planning to use Jet Grouting columns all around the...
Hi,
For a tunnel construction we are drilling boreholes and want to perform P-S Logging tests. However, due to some reasons we can not provide P-S Logging instrument.
Does anyone have any idea which other test(s) can be performed to get values comparable to the values that could be taken from...