Hello Everyone,
We need to rectify the connection bet. the boxculvert and wingwall expansion joint because vertical cracks exists due to settlement on the wingwall and wrong orientation of joint connection Inlet side. Our plan is to correct the expansion joint and break the vertical crack...
What are the main use of a Grouted Rubble Paving as per plan it will be constructed along and above the pipeline connecting to dropinlets, along the perimeter of boxculverts and outlet of pavement subdrain and at the end of lineditches....can anyone wahts the use of GRP
I am working as a planning engineer here in Palau, I have a problem regarding proposal for deletion of lineditch at the top of the cutslope can anyone help me what are the possible reasons for such deletion of lineditch because the design slope is not workable to put up lineditch because it is...
I am working as a planning engineer here in Palau, I have a problem regarding proposal for deletion of lineditch at the top of the cutslope can anyone help me what are the reason for such deletion of lineditch because the design slope is not workable to put up lineditch because it is very high...
I need help in the rectification of drainline the RCP pipes and inlet/outlet structure is above the design elevation of about 750mm, based on the actual condition pipes adjacent to the inlet is only 120mm above the bottom surface of the subbase material, our CQC recommend that to remove the...