I work in the construction development department at a restaurant company. I have a new site, in Connecticut, that is will occupy a space that was former pizza place. The entire strip center is tied to a septic system. The CT Dept. of Env. Protection is requiring us to collect wastewater samples...
Thanks dicksewerrat.
So if I calculate the velocity exiting this pipe using the mannings formula that will give me the maximum velocity and then the maximum Q after multiplying V*A, correct? Then base my pump size on this capacity. Do I need to know the upgradient contributions to this line...
Question: I work on an enviromental remediation project where we need to remove a section of a sewer line due to contamination. What we need to do, is order the correct rated pump to handle the flow rate of liquids that would normally pass through this line from the upgadient areas. There are...
I am not an expert on this matter but have looked into it for one of my jobs where we wanted to cutoff groundwater for a deep excavation. We are currently looking at using sheet pile with seals added in between sheets. You can either apply a compound (with a caulk gun type application)as you...
Question: I work on an enviromental remediation project where we need to remove a section of a sewer line due to contamination. What we need to do, is order the correct rated pump to handle the flow rate of liquids that would normally pass through this line from the upgadient areas. There are...