Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: 1044B
  • Order by date
  1. 1044B

    the Different between Pipe Bend and Elbow

    What is a consideration of pointing out the pipe bend or elbow on tie in spool. I found some of design use pipe bend and the other use elbow.
  2. 1044B

    API 2H Grade 50 with S1, S2, S3, S5 and S8 requirement

    Thanks a lot to metengr for your valuable post. I have got the document regards,
  3. 1044B

    API 2H Grade 50 with S1, S2, S3, S5 and S8 requirement

    I am searching on requirement S1 S2 S3 S5 S8 S12 for the plate API 2H grade 50. I beg someone can explain more clearly about this requirement . Any reference or website is highly appreciated. Thanks a lot
  4. 1044B

    J tube

    I hope someone can explain more clearly about J tube, and how to estimate it. any comments is appreciate. regards, Ron
  5. 1044B

    Passive fire Protection

    Will passive fire protection (PFP) be required as a protection on wellhead platform (WHP) with manifolds, oil wellhead and and separator with gas lift facility on 1000psig, injection well 2500psig, connected to Central Production Platfrom (50m)?? What is the consideration if PFP is required on...
  6. 1044B

    Passive fire Protection

    Will passive fire protection (PFP) be required as a protection on wellhead platform (WHP) with manifolds, oil wellhead and and separator with gas lift facility on 1000psig, injection well 2500psig, connected to Central Production Platfrom (50m)?? What is the consideration if PFP is required on...
  7. 1044B

    Passive fire Protection

    Will passive fire protection (PFP) be required as a protection on wellhead platform (WHP) with manifolds, oil wellhead and and separator with gas lift facility on 1000psig, injection well 2500psig, connected to Central Production Platfrom (50m)?? What is the consideration if PFP is required on...

Part and Inventory Search