Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Hnewton

    Severely Settling Sidewalk

    We hired a consultant to perform the test. They videotaped the probe and reported to us that the joints were tight. They did not mention anything about "lift holes" The pipe is VC, would it have holes in the perimeter?
  2. Hnewton

    Severely Settling Sidewalk

    The sewer was constructed circa 1926. The sidewalk was built much later. Is it likely that the backfill is fully consolidated?
  3. Hnewton

    Severely Settling Sidewalk

    I am designing a repair for a severely settled sidewalk. In some locations the sidewlak has settled in excess of 4". There is a sanitary sewer that runs undernesth the sidewalk for its full length. We have sent a robot through the line but have not detected any signs of leakage. My approach...
  4. Hnewton

    Structural Steel Design -ASD

    I am teaching myself Structural Steel Design - ASD method. I am using the book by McCormac, I would like to obtain the solutions manual for this book and am willing to pay for a copy. Any assistance would be greatly appreciated.
  5. Hnewton

    Reentrant corners

    What is the difference between a sharp corner and a reentrant corner?
Back
Top