Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: marcv
  • Order by date
  1. marcv

    TR-20 Lag Method - proper use

    How do I apply the required hydrologic length in a Lag Method time of concentration computation for a roadway surface having a closed drainage system? Example: Drainage area A is a 300 ft. long x 12 ft. wide, paved, curbed area sloping to a catch basin. The cross slope is 2% and the...

Part and Inventory Search

Back
Top