Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  • Users: jbp
  • Order by date
  1. jbp

    Compaction of frozen soil

    Working with frozen soil will almost always yield unacceptable results. One time I allowed a relatively small amount of frozen silty clay to be buried deep in a road fill. The material was approximately 15 feet below grade. I justified it in my own mind that if the frozen soil is thoroughly...
  2. jbp

    bore drilling procedures

    A hole is drilled using solid-stem or hollow-stem augers to a specified depth. A split-spoon sampler at the end of some drill rods is then inserted through the hollow stem augers (solid-stem augers are withdrawn from hole prior to sampling). With the sampler resting at the bottom of the hole...
Back
Top