I am a structural engineer in the Philadelphia region. Within the past year or two, there has been a trend where the design of the CIP piles, caissons, and concrete-filled pipe piles has not been provided by the geotechnical engineer for the project. My questions are: 1) Have other people seen...
I am a structural engineer in the Philadelphia region. Within the past year or two, there has been a trend where the design of the CIP piles, caissons, and concrete-filled pipe piles has not been provided by the geotechnical engineer for the project. My questions are: 1) Have other people seen...
For two-way flat plate construction, thread thread726-155029 discussed the amount of unbalanced moment that is transferred by flexure from the slab to the column. That is clear. What is unclear, however, is the exact load path by which the moment transferred by flexure from slab to column...
For two-way flat plate construction, thread thread726-155029 discussed the amount of unbalanced moment that is transferred by flexure from the slab to the column. That is clear. What is unclear, however, is the exact load path by which the moment transferred by flexure from slab to column...