SJones,
Yes I was referring to ASME 31.3 piping. And the information I've gathered so far is leaning towards the coated carbon steel being less attractive. The coating manufacturer the client suggested has a spool length capability of 10' and simply looking at construction of the piping would...
I'm in the early stages of investigation on a project using CO2 for EOR. The CO2 may have some moisture initially, but when the oil is being extracted through the wells, there will be oil, gas, and water. Therefore, all the CO2 separating equipment will be exposed to wet CO2.
The options that...