The immediate area around the vessel should also be classified, albeit a different classification level. Consult relevant standards for more information.
Hi all,
I'm trying to do a justification for building a new power plant and need to do a TCO comparison between the existing plant a new one.
To do this, i need to have a curve that shows the gas consumption at different loads for a 10MVA gas generator, specifically a Solar Mars 100...
We have a suspected cable fault in one of our facilities. We have isolated both ends of the cable but the cable route is not known. We have excavated a joint on a cable which is suspected to be the same one but there is no way to confirm before working on the joint.
We have also tried to use a...
We have two TB5400 units in our facility. Each unit has a meter that displays the power factor and load in MW.
While the load calculations in the facility is done using 0.8pf, I noticed that the pf readings for the two turbines are 0.8 and 0.9 respectively.
Does anyone know why this is?
How do...
Just discovered what code will give the required number format.
Shahyar, you could right-click on the cells you want to format, click format cells, on the number tab, select custom, select a number format close enough and ensure that you specify the style you want (or nothing) after the second...
I expect that MS Project should recalculate / or reschedule the project once the work rate has been defined.
An open source alternative you may want to consider is the open Workbench which will do almost everything MS project will do. It can be downloaded free at www.openworkbench.org.
You can...