  1. palesezt

    Timber Pile/Concrete Cap Connection

    Thank you very much. Just what I was looking for. Any suggestions on steel orientation in the cap under a single pile. Calculated the required are for punching shear. Need to figure out orientation. Just a mat at the bottom surface ... Thanks for your help. JP
  2. palesezt

    Timber Pile/Concrete Cap Connection

    Could anyone give advice on how to connect a timber pile and a reinforced concrete pile cap? Let's say a 12" pile with a 3'x3'x36"deep pile cap. TIA, JP
  3. palesezt

    Pile Foundation on Landfill

    Thank all for the replies. Regarding the building size and footings, it is a preengineered steel frame buidling (140'x150') that requires 18 footings, 7 on each side and 2 additonal at each gable end. The dead, live and snow loads, factored, result in less than a 20kip load on the footing (in...
  4. palesezt

    Pile Foundation on Landfill

    Thank you for the quick reply. I have not been that involved up until now. It was apparently a very old trash dump (25 years or more). It is not an "engineered" landfill. So no cap. I will have to ask the planning board more to understand the history. Thanks again. JP
  5. palesezt

    Pile Foundation on Landfill

    Dear Friends, I am new to the group, so please bare with me. I am a strcutural engineer by education and have been working in the railway industry for 15 years. I am very active in my community for youth sports. Although not active with the wrestling organization, I know many members from...