PS - Could I replace the service entrance section (27") and one of the house sections (15"?) with a CT Meter section with a main (36"), and relocate the abandoned house loads and reconnect the second house section? Would the meter/main section have provisions for service entrance?
OK, I could use some suggestions for this small commercial building design project!
This is a link to a picture of the switchgear.....
http://pg.photos.yahoo.com/ph/itscdanimal/detail?.dir=532d&.dnm=2fd5.jpg&.src=ph
There are parallel 600A feeders running underground from the power company...