Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. 15121981

    Design of chemical storage building

    I searched this site for this and I gathered valuable information (concrete cover, epoxy coated reinforcement, 40MPa concrete). 1- Are there other considerations regarding design of RC design of such structures? Warehouse design is fully safety nothing specific wrt to RCC design. At least 100 mm...
  2. 15121981

    Design of chemical storage building

    Firstly Have u done the Risk assessment study as a part of design as many chemical cannot be kept together due to different mitigation requirement during failure. Now there are various concept from design point of view. 1.Plan for Safety showers if chemical are hazardous and is available in...
  3. 15121981

    Transformer Fire prtoection

    I hope this time sketch link is attached. http://files.engineering.com/getfile.aspx?folder=203ca0bf-4df9-4e54-8974-70755243c90a&file=Sketch.docx
  4. 15121981

    Transformer Fire prtoection

    thanks for responding. We have transformer kept at ground floor attached to building. e.g we have 24 meter building the central part 18 meter we have concrete slab and 6 meter arms on both side for transformer bay.Hope this clarify your query,please find the attached sketch
  5. 15121981

    Transformer fire protection

    Hi, We have Oil filled transformer in cable cellar area part of our substation. (Cable cellar: we mean that swithcgear has been kept at First floor level & on ground the cable layed & are terminated in switch gear) Transformer are covered all the three side with 2 hr fire rated wall...
  6. 15121981

    Transformer Fire prtoection

    Hi, We have Oil filled transformer in cable cellar area part of our substation. (Cable cellar: we mean that swithcgear has been kept at First floor level & on ground the cable layed & are terminated in switch gear) Transformer are covered all the three side with 2 hr fire rated wall...

Part and Inventory Search