I am also looking for a similar system (to remove water, H2S and CO2 from natural gas. Flow rate will be about 16 mmscmd (million standard cubic metres per day), any idea how much will the system cost?
Please tell me how to calculate effective length of column for an industrial building where in one direction it is connected by truss at the top only and on the other direction transverse beams. Shall we consider the total height of the column from the truss level to floor or the intermediate...