Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. weyerengineer

    Root cause and project management

    Thanx for your feedback. when I said operators I was referring to the Lathe and Deck operators. These are the people in charge of the core production, because we peel fiber logs to produce veneer (raw material for plywood) and the by products from this process are cores. My project is centered...
  2. weyerengineer

    Root cause and project management

    I am a recent IE grad. I have been asked to lead a project that involves increasing the core recovery in our veneer production process. I identified the drastic reduction in our process and as a result I was assigned to spearhead the project. first, I have determined the root cause and it seems...
  3. weyerengineer

    Time Studies

    I need some advice in conducting time studies in a manufacturing environment. I am a recent graduate with an entry level position. can anyone suggest some methods or books I can look up for support and referral. Thanks

Part and Inventory Search