Hello, Everyone.
We want to build a big methanol production plant based coal.
We want to use an integrated coal gasification combined cycles plant to provide steam and power for this plant,this idea of coproduction of power and chemicals.
But somebody said a gas turbine have to stop for check...
Thanks very much.
If our gas turbine and steam turbine can run for six months stablely, Everything is OK.
Now we already selected GE 9FA, the whole output is 280MW, so we can't use an N+1 design. Perhaps we should use an syngas-based boiler to supply the steam and power.
Another question is...