Dear all,
I am designing the rock tiedown anchors to take uplift load of the footing due to temperature load. At the site boring, 2 rock corings were conducted, both had a 2' of void out of 5' run, that implied a Rec 60%. The RQD is 47%. Rock is Gneiss. Unfortunately, due to the technical...