  1. hidalgoe

    Change Settings on Protective Relays

    Hello: I work for a US government agency. We recently replaced our 30 year old substations in our administrative building. Quite recently a grounded\shared neutral situation caused a feeder ground fault relay to trip the feeder breaker. To remedy the situation we will have to revise the...
  2. hidalgoe

    Connecting Building Grounding System to 12.47kV System neutral/Ground

    Hi: Sorry to all the 12.47kV reference was a mistake. Hidalgoe
  3. hidalgoe

    Connecting Building Grounding System to 12.47kV System neutral/Ground

    Hello: A small pump house building was recently connected to our 4.16kV overhead distribuition system. Basicall the system consists of a 150kVa pad mounted transformer (4.16kV Delta Pri - 208Y/120V Sec. At the pole cutouts the surge arresters are tied to a ground rod at the pole base. The...
  4. hidalgoe

    UPS 50 gal of Electrolyte Limitation

    Hello: In the US the two main fire codes (IFC and UFC)impose a limitation of 50 gal of electrolyte for UPS VRLA battery systems. Apparently the official interpretation is that the 50 gal of electrolyte is the aggregate sum of the battery systems in a specific space (data center, battery room...
  5. hidalgoe

    Surge Arrester Placement

    Hello: A decision was made by my management to install surge arresters at every other pole of a 69kV line thats 3200 feet long between the utility metering point and the main substation 69kV incoming switch. The distance between poles is 200 ft. The line has a guard wire. Also the surge...
  6. hidalgoe

    Doble Testing on Dry Type Transformers

    Hello: We recently specified Doble testing (tip-up) on a 750/1000kVA dry-type transformer (20+ years old) as part of a comprehensive test regimen. Our NETA certified test company said that they would do it, but would not be able to get any useful information because the transformer is a...
  7. hidalgoe

    Power System Studies and ArcFlash

    Who can legally perform power systems and arcflash studies? Can they be performed by technicians who will then use the study results to set protective relays and select fuses.
  8. hidalgoe

    Ethics of MBE & WBE

    Sundale, Just a reminder that there are people of all races in Mexico, Panama, Cuba, Puerto Rico and the majority of Central and South American countries. Hidalgoe
  9. hidalgoe

    Use of PE after name

    BRGENG, Just a kind reminder that US territories like Puerto Rico and US Virgin Islands, also have licensing boards and are NCEES recognized. Hidalgoe
  10. hidalgoe

    Stepdown transformer used as stepup transformer

    Hello: A 12.470kV/4.16kV, 3750kVa trafo is being used at our campus facility to supply sundry loads at 4.16kV through a secondary VCB with 50/51 relay protection. It was decided by some of our technicians to use it as a step up transformer to supply a 12.47kV load while a new feeder is being...
  11. hidalgoe

    Westinghouse Transformer Insulation Type

    Hello: We have Westinghouse Power Centers in one of our buildings. These centers have ASLR dry type transformers (12.47kV,500/666kVA, 150 degree C rise, Sharon Plant, 1978)). Recently one of these transformer caught fire and released a lot of smoke over a period of 1/2 hour. Our fire dept...
  12. hidalgoe

    Transmission Line Transposition

    Hi: Our local utility does not transpose its HV lines (as far as I can see by looking at its transmission and subtransmission lines). Is there a need to be worried about this as far as overcurrent relaying is concerned? Thank you kindly, hidalgoe
  13. hidalgoe

    Recent Engineering Debacles

    HellO: What have been the results of recent engineering debacles, like Boston's Big Dig concrete section that fell and killed some folks in a car or Katrina meant for PE's as far as liability and ethics are concerned?
  14. hidalgoe

    SEL 351S Relays

    davidbeach,dpc,jghrist,stevenal: I called a colleague who was familiar with the SEL 351S and discussed this relay's multi-functionality. We came to the conclusion that what I need is separate OV/UV protection; a relay that will provide the time-voltage characteristics that I want for OV/UV...
  15. hidalgoe

    SEL 351S Relays

    rbulsara: I appreciate your concern. I have over 35 years of experience as a PE and power systems engineer. I have done projects for small and large industrial plants and for colleges, universities, hospitals and a few medium sized utilities. My motivation was obtaining advice on a relay I...
  16. hidalgoe

    SEL 351S Relays

    dpc: We have no load shedding scheme implemented at this time or other frequency relaying When I set the old 27/59 electromechanical devices I had access to time-voltage curves, but with the 351S I have not been able to locate any. Yes, I would appreciate advice on settings for this advanced...
  17. hidalgoe

    SEL 351S Relays

    Hello: We recently replaced our old main substation electromechanical relaying system with a SEL 351S/351A system. The 351A relays are for feeder protection and the 351S relays serve as main secondary breakers. Our substation consists of 2ea power transformers (69kV/12.47kV, 15/20MVA ABB)...
  18. hidalgoe

    S&C Trans-Rupters

    The CTs are protecting the transformer. The 69kV lines feeding the transformers have load break switches up stream of the Trans-Rupter. The lines can be de-energized using these switches. We also have a tie switch at our main substation to parallel the transformers in case we want to shut down...
  19. hidalgoe

    S&C Trans-Rupters

    Our Main Substation transformers (15MVA, 69kV/12.47kV)have S&C Trans-Rupters with overcurrent protection on the 69kV side. What would be the best placement for the CTs used with the overcurrent relays: on the line side of the Trans-rupters or on the load side of the Transrupters.
  20. hidalgoe

    Transformer Startup - Primary Overcurrent Protection

    dpc: The company tested the OLTC was tested thoroughly and given a clean bill of health. The tripping did occur on phase instantaneous (set at highest settings) and a .3 sec additional time delay added.