    Got an 60 m propane-propylene split

    Got an 60 m propane-propylene splitter for manufacturing and installation. Need any clues about manufacturing - "in one" peace by welding or by modular - flanged peaces. Also need an "for and against" explanation (standard limitations) for any of mentioned. Thank you for help.
  2. ikarga

    PWHT

    OK, guys, this morning got an additional explanation from Client - we will do just welds PWHT (price of contract should be changed if we have to do COMPLETE HT of vessel. Thank you for your efforts, especialy to r6155 - UW-40(a)(1) was crucial for Client. Thank you all Regards
  3. ikarga

    PWHT

    Thank you guys. Actually, I didn't find any requirements in ASME VIII for heat treatment of complete vessel, but in technical requirements Client just put "PWHT" without to specify is this for complete vessel. Just want to know what ASME require and what is a good engineering practice. Regards
  4. ikarga

    PWHT

    In what conditions there is a need (must) for heat treatment of complete pressure vessel?
  5. ikarga

    heat exchanger firefighting steam

    Any information about heat exchanger firefighting steam system...standard ...good engineering practice... Thank you
  6. ikarga

    Prefered location of ball valve on vertical portion of pipe

    Little inch, thank you for your efforto. My attention was to ask, but some issues were more important. Next time... Thank you ones mnore to you and the guys.
  7. ikarga

    Prefered location of ball valve on vertical portion of pipe

    Thank you to all...especialy to Mr. David Simpson, PE... As for Little incg - fluid is Hydrocarbonm and Client asked for some portion of pipe this position of valve...it is reachable, but requeast was to be vertical (ball or globe), but vertical...and I wonder why.
  8. ikarga

    Prefered location of ball valve on vertical portion of pipe

    Prefered location of ball valve on vertical portion of pipe? Why?
  9. ikarga

    Minimum number of workers

    EmmanuelTop thank you - nice document and cooperation. Appreciate!!! Best regards ikarga
  10. ikarga

    Minimum number of workers

    Thank you EmmanuelTop appreciate your effort supporting me in resolving this problem. Also, thank you for the document you sent. Best regards ikarga
  11. ikarga

    Minimum number of workers

    Honorable, thank you for the information. Will start from here. Best regards from Sarajevo
  12. ikarga

    Minimum number of workers

    Working within basic oil refinery I was wonder what is minimum number of workers for distilation, de-paraffination, whitening of oil and paraffines, shaping of oils and paraffines. Can somebody advice the necessary literature, standards etc... Thank you
  13. ikarga

    Three Phace Naphta Separation

    Need check list and startup procedure for naphta three phase separator
  14. ikarga

    Tube bundle extracting

    Actualy, I have two of them - one is 23 t and another 39 t. Both 10 meters long. Also, I have some example from previous extracting tools. To be clear, I have a civil engineer in team, as well as any other help I need. I did basic design. My real problem is narrow space arround Hx and this...
  15. ikarga

    Tube bundle extracting

    Thank you Duwe6 - appreciate - already did the Hx, and, yes, there is huge quantity of samples - but I have to do this on my own, usin experienced designer from some web sites. Orientation of company is to do this for low money. Appreciate if there is some procedure for inserting tube bundle -...
  16. ikarga

    Tube bundle extracting

    I've got to construct tool for extracting tube bundle from heat excahnger. My question is generaly - is there any guides inside shell so I can be sure that tube bundle is well orineted since there is friction steel-steel? Thanks!
  17. ikarga

    PSV Noise Calclucation

    Already did, but thank you!
  18. ikarga

    PSV Noise Calclucation

    thread1203-200194 Is there any noise level calculation method for PSV conected to flare piping? Thanks!
  19. ikarga

    Piping Class Determination

    What is methodology to determine piping class? What is e.g. piping class RA01. Can anyobdy provide Excel diagrams for piping class?
  20. ikarga

    Piping Material Price List

    "First purchase then price" means that I must supply quantities if I want price. It is reasonable and not a problem, but sometimes I don't have time to wait for price, because everybody wants estimation "yesterday". IVNJ - unfortunanately I am not in USA. I am from country not expected to have...