I designed a soldier pile wall with ties back to a short anchor pile located 40'-0" behind the main wall. The main soldier pile wall retains a cut of 19.50', and the soldier pile embeds a min. of 12' below dredge line. I had the tie at 6' below top of wall, and the short anchor pile extended...