It is a parallel run to the same termination point. Since the shielded requirement for 5kV is new in 2005 NEC, this is my first (but definitely not the last) encounter with it at our plants. Just a little surprised the NEC didn't address this particular situation.
I need to parallel an existing 600ft run of 3 conductor w/gnd 5kV MV-90 500kcmil IAC type cable for an expansion. NEC states 5kV cable needs to be shielded and parallel cables need to be of the same basic design and terminated the same way. Seems shielded cable would have different...