  1. unnikri57

    capacitor banks and passive filters

    I am having a situvation where the PCC panel connected to the transformer secondary (up stream)is having a passive filter and a Motor control centre connected to PCC ( down stream ) having a capacitor bank. Do we need both passive filter and capacitor banks in a installation.
  2. unnikri57

    how to have AMF with mechanical interlock for DG

    We want to operate a DG set with AMF so that it will automatically start and connect to load. but local restrictions call to have mechanical interlock between the incoming breakers of DG and main power. Can we use Bowden cable in this case for interlock. will it work in Auto mode with Bowden cable.
  3. unnikri57

    VFD rating

    I have a situvation where my load is 17.5 kw and is fixed to a motor 22 kw ( since 18.5 kw not readily available) can i run the system with existing 18.5kw VFD.
  4. unnikri57

    IEC procedure for factory testing of induction motor

    IEC testing procedure for motors
  5. unnikri57

    transformer

    I have a installation designed with a duty standby transformer .in case of failure of duty transformer the standby one will take the full load. normaly standby will have no load connected. I wonder will it be better to load both transformer 50% and incase of failure of one transformer,the other...