  1. AN1

    Fixture Quantity, Septic Tank and Leach Field Sizing

    I have a question on sanitary fixtures, septic tank and leach field sizing I have an office type building that will be used for 3 shifts; each shift will have 10 occupants. Also and potentially more critical, there is a conference room in this building that can hold up to 50 occupants, but it...
  2. AN1

    Septic Tank and Leach Field Sizing

    I have a question on sanitary fixtures, septic tank and leach field sizing I have an office type building that will be used for 3 shifts; each shift will have 10 occupants. Also and potentially more critical, there is a conference room in this building that can hold up to 50 occupants, but it...
  3. AN1

    Generator Start Up vs. Full Speed Operation

    Hello All: Thank you for the responses. I should have been clearer in my question related to power plant generation. I am trying to determine the added cost of starting up a natural gas turbine/generator to full speed and full load versus its normal operating cost. I was wondering in general...
  4. AN1

    Generator Start Up vs. Full Speed Operation

    I am sorry to pose the following basic question. I am not an EE. I have a general question regarding the efficiency in or cost of starting a power generator cold to full speed/full load. I suspect the efficiency/cost of this can be broken down into fuel, and wear. Are there any rules of thumb...
  5. AN1

    Paper Space v. Model Space and Scale

    I am sorry to post such basic questions, but could someone tell me what is drawn in paper space v. model space and if there is any reason not to drawn in full scale. Finally, is there a drawing standard out there that spells this out? Thank you
  6. AN1

    Load due to Velocity of Water

    I have a question regarding the generally accepted practice of calculating forces on a stationary structural element due to water moving past it. Essentially, I have a cantilevered pipe affixed to a stationary block. The pipe will have instruments attached to it. I need to design the pipe and...
  7. AN1

    Force due to Velocity of Water

    I have a question regarding the generally accepted practice of calculating forces on a stationary structural element due to water moving past it. Essentially, I have a cantilevered pipe affixed to a stationary block. The pipe will have instruments attached to it. I need to design the pipe and...