Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  1. gekko1

    Determining ratings for 11kV switchboard

    These 11kV CB's are both in the switchboard and feed each end of the ring from the board. To summarise : Supplies to the board are 1. 11kV from the local network, and 2. two gensets (each with their own 11kV CB). Load is two 11kV CB's feeding the ring.
  2. gekko1

    Determining ratings for 11kV switchboard

    We have a site requiring 2 x 1MVA diesel gensets to feed an 11kV switchboard, each through a separate 11kV CB, with 2 x 11kV CBs feeding a ring main (load around 1MVA) and a feed from the network (for when the 2 gensets are not operational) through the 5th 11kV CB. 1. How do we calculate the...
Back
Top