Hi All-
We have about a 6 foot high gravity wall holding back soil and we will be putting in a wastewater leachfield next to it. The county requires 10 foot seback from retaining walls, but we don't have 10 feet so we are looking to put the leachfield in about 5 feet away from the base of the...