MOST is a predetermined time system developed by the HB Maynard company. A good description is found in the 5th edition of Maynard's Industrial Engineering Handbook.
As a long time industrial engineering educator let me suggest that a good source of this training might be your local industrial engineering or IE technology program. Another good source would be the professional organizations, such as IIE.