Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: drfads
  • Order by date
  1. drfads

    Excel Issues

    Nope- its not a memory issue. I have 4 GB to spare_ tried running application in solitude to cancel out any overload (too many processes)- that did not help either>>>
  2. drfads

    Excel Issues

    Thanks for your replies- the issue is now occurring intermittently.
  3. drfads

    Excel Issues

    I cannot delete rows in Excel 2007 which I am running on Windows 7(the RC Candidate). Every time I tried to delete a row (even a single row) this message pops: "Excel cannot complete this task with available resources. Choose less Data or close other applications" Please advise.
  4. drfads

    Excel

    I did try it bit seems like I am not doing it rite, will post comments after further testing. Going back I really think I need some kinda invoke script like when Selection.paste in a range automatically run macro. See if you can point me into a direction. Thanks
  5. drfads

    Excel

    I guess, I could try those- How do you use the "Beforeclick" command.
  6. drfads

    Information on Sanitray Lift Station

    I have been assigned with looking into a sanitary lift station project at an airport. I was wondering if some one could guide me || link me towards a rough idea of a typical station. I am also supposed to get a rough idea of the cost, but I guess, will have to get in touch with a manufacturer...
  7. drfads

    Lift Station Question

    I am assisting in a Lift Station project- its a storm water lift station close to an airport. I wanted to find out more specifics of a typical storm water lift station.I know this is a bit awkward for most of you qualified folks out there, but I will appreciate your help. The other thing is that...
  8. drfads

    Beam Breaks falling @ 28days

    Yes,there a mix design submittal and it did indicate compliance with flexural strength, curing and other relevant spec requirements. And yes, the mix design was based on the materials used for the mixture that was actually used for. So this is real frustrating mystery which has no ends or...
  9. drfads

    Beam Breaks falling @ 28days

    Reply to henri2 (Materials) Thats then link which made me join these thing. I initially checked it out and did not get much from there, anyways thanks again
  10. drfads

    Beam Breaks falling @ 28days

    Reply to cvg (Civil/Environme) My point is that there exists no transit mixer at all,these guys use dump trucks to transfer the concrete mix from the batch plant to the site.As for my information we have our inspectors at the plant to make sure the process is done according to the specs.
  11. drfads

    Beam Breaks falling @ 28days

    Reply to Ron (Structural) Again,I have ckhecked to place where the techs store the beams. Someone suggested that the calibration on the machines might be the reason. But,The lab is clean...certified and has been operating for yonks... the lab just passed its inspection too. so nothing regards...
  12. drfads

    Beam Breaks falling @ 28days

    I have the same problem,the beams break before the 28 days period without the required flex strenght.I have checked the plant, the lab techs. But last time I saw that the mix was loaded into dump trucks,forget mix trucks..... I thought to myself maybe that could be the reason..Please advise.

Part and Inventory Search