Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. purnawan

    Hydrostatic Test of Piping With Vessel as a System

    thanks for your response guys As additional information, because the amount of piping system is very much then if the piping test alone, amounted to more than 1000 packages. If some test piping package with vessel as a system, it can be reduced in number. Also, because the design pressure is...
  2. purnawan

    Hydrostatic Test of Piping With Vessel as a System

    Hi guys, My company currently have a project, Ammonia Urea Plant Project. The contractor is preparing the hydrotest plan for piping system, he would like to carry out the hydrotest of piping system together with the connected static equipment to expedite the progress, which s allowed by the...
  3. purnawan

    NDT for ammonia storage tank

    many thanks weldstan, Duwe6, MJCronin to your advise and valueable information. Ammonia stored is anhydrous at temperature -33C. The tank is double wall, diameter of inner shell 40250 mm and outer shell 41750 mm. Annular space filled with perlite insulation. We have existing 4 ammonia tanks...
  4. purnawan

    NDT for ammonia storage tank

    thanks gentlemen, in my consideration is the technical design of the ammonia storage tank follows API 620, while the phased array method has not been accommodated in API 620 (please correct me if I wrong). Therefore, technically, can I use PA method to replace RT method?
  5. purnawan

    NDT for ammonia storage tank

    Hi Dear, as per Code, whether phased arrays test method could be used for ammonia storage tank to replace radiographic test? What are the things that must be considered to make phased arrays test. Many Thanks
  6. purnawan

    Hydrogen Induced Cracking : Hardness criteria for NH3 storage tank

    thank you very much gentlemen for the responses and advise
  7. purnawan

    Hydrogen Induced Cracking : Hardness criteria for NH3 storage tank

    Dear metengr & weldstan, scope of Appendix G.3 is the corrosion because of presence of hydrogen sulfide in the service condition, isn't it?. In the existing ammonia storage tank (I have 3 exisiting tanks) we inspect every 5 years, no corrosion problem I found. Normally liquid and vapour ammonia...
  8. purnawan

    Hydrogen Induced Cracking : Hardness criteria for NH3 storage tank

    For ammonia (NH3) storage tank (plate material of A537 Cl.1) of capacity 20.000 MT, is it a must to apply API 620 appendix G (G.3) Hydrogen Induced Cracking ??
  9. purnawan

    PUMP MATERIAL

    Which material is the best for pump to handle Ammoniated phosacid liquid, HA 28.5 : 654 SMO : HV 9 Ammoniated phosacid : 28-48% P2O5 - N/P :0.1-0.l42 - 10% solids - 5% H2SO4 (MAX). Traces Cl- , F HA 28.5 : 26-28 % Cr : 5-7 % Ni : 3-4 % Mo : 0.03-0.46 % C 654 SMO : 24 % Cr : 22 % Ni : 7.3 %...
  10. purnawan

    AMMONIA LINE

    I have some questions here. 1. In ammonia line ( dia 4", 6" ), is it recommended to use socket welding joint ? 2. What about inspection & test procedure ? Best regard Purnawan
  11. purnawan

    CAN TYPE PUMP

    I have some questions here. 1. I need an ammonia pump (vertical can type) with specification : capacity 30 m3/h, total head 13.5 kg/cm2, and NPSH A. = 0.4 m. Is it possible to get a pump with dia. Of barrel < 700 mm and distance between center line of suction nozzle and bottom of barrel < 1700...
  12. purnawan

    CAN TYPE PUMP

    I need an ammonia pump (vertical can type) with specification : capacity 30 m3/h, total head 13.5 kg/cm2and NPSH A. = 0.4 m. Is it possible to get a pump with dia. Of barrel < 700 mm and distance between center line of suction nozzle and bottom of barrel < 1700 mm ?
  13. purnawan

    ammonia line

    I have some questions here. 1. In ammonia line ( dia 4&quot;, 6&quot; ), is it recommended to use socket welding joint ? 2. What about inspection & test procedure ? Best regard Purnawan
Back
Top