Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. KevinBarr

    Boiler welded nozzle joint gap

    In B31.1, a 1/16" pre-weld gap is required in socket welded pipe joints between the pipe end and the shoulder of the fitting. thread178-25615 contains some discussion and even an explanation of the origin of this gap. However, I do not see any referral in the BPVC (sect. I or VIII) that...

Part and Inventory Search