    Interview Question for Production position

    I later got a phone call from the company recruiter and she was open and frank with me. I needed to work on my answers. I need to be brief and to the point, unfortunately the questions I was asked were tough and I had to improvise the answers to the point I strayed from the question and on top...
  2. MrAndersson

    Interview Question for Production position

    Thank you for the advice. I used it in a way or another, although in my interview I was nervous and my answers were not to the point. I prepared myself so much and the first question is all it took to throw me off and I thought it was down hill from there. However I just got a call for my 3rd...
  3. MrAndersson

    Interview Question for Production position

    Hello, I have an interview this week I wanted to be prepared for a couple of questions and wanted your feedback. I'll start with question number 1 for now. Scenario: My position would be a shipping coordinator. 1. If you were asked to ship an order (Hot Rush) today. Would you and how would...
  4. MrAndersson

    Inventory System

    The problem was on two spots. The first one was that the material manufactured was not counted and the second problem was that when more material is used, it is not recorded in the books. So, lets say I have 12 sqft quoted and I used 13 sqft. 1 sqft is nothing, so what, but it adds up...
  5. MrAndersson

    Inventory System

    Hello, I work for a company that has a huge discrepancy with Inventory. We have rolls of material inside crates, it is expensive fabric rolled in a tube. Each crate has several tubes of fabric inside. So 1 Crate has several rolls of material. An excel spreadsheet is used to deduct the...
  6. MrAndersson

    Forklift Certification

    When I mentioned he was playing music. I'm talking about music through the speakers mounted on columns where everyone in the plant can hear the music.
  7. MrAndersson

    Forklift Certification

    The liability is a very important topic you mention. I haven't thought of that part, but thank you. He is not professional at all. Just to mention something. We have speakers at the warehouse and he tuned in some religious music. I had to complain. Today he was playing classical slow music...
  8. MrAndersson

    Forklift Certification

    Hello, I have a Co-worker and he is in a management position. He is not an engineer, but a person who has a lot of construction experience, but no manufacturing experience or not much experience. Working with him is very very hard, he is not professional at all at the manufacturing plant...
  9. MrAndersson

    GD&T for Teak wood

    The decks are all done before they are installed on the boats. The first part is to create a template of the deck, take the template and then create the teak decks. There are several tolerances I have to work with but none are defined. The first one is the tolerance with the template. I...
  10. MrAndersson

    GD&T for Teak wood

    Hello, I would like to know if there is a tolerance defined for teak wood for boats. A teak standard is 40 mm id from the caulk line to the other caulk line. A caulk line is 5 mm wide. A margin width is 60 mm. What would be an acceptable tolerance for these dimensions. Has this been...