  1. VAElec

    electrical service

    I would consider a tap box of some sort after the meter and ahead of the MDP. Check NEC 240.21(B) for the 10 foot tap rule. Size the feeders for the MDP and Server Room Loads for the combined load and then tap off the feeder for each individual load. The disconnecting means for each becomes...