I just recently been assigned the task of studying a client's pilot plant blowdown system. The objective of the study is to determine whether or not the blowdown tank they currently have is adequate for their system. If not they are going to want a redesign/new size. I am to study the system...
I just recently been assigned the task of studying a client's pilot plant blowdown system. The objective of the study is to determine whether or not the blowdown tank they currently have is adequate for their system. If not they are going to want a redesign/new size. I am to study the system...