Can you talk to your geotechnical engineer, and let him know your predicament?. The actual soil bearing cappacity may be higher that what was in the geotech report.
Hi there,
With seismic loads, and a rigid floor diaphragm I apply the load at the center of mass and let the computer distribite the force to the braces according to theirrelative stiffness's.
Is wind load on a building with rigid diaphragms applied in the same way? Or is wind load applied to...